TheXnator wrote:
I'll try to look over the logs at some time before the meeting to see if I can confirm your story, and we will discuss this in the Lead Team meeting. Can you tell me which day(s) you believe did not log correctly?
He got the required amount of time, but it didn't save.
He asked me if he got the time, I looked over it and he got 15 minutes extra.
I don't remember which day it was.